Skip To Main Content

mobile-menu

mobile-header-portals-nav

mobile-main-nav

header-container

logo-container

logo-image

right-container

right-top-container

district-nav

header-portals-nav

translate-container

search-container

right-bottom-container

Horizontal Nav

Breadcrumb

Honoring Our Past - Building Our Future

November 3 Levy Information banner showing a charcoal sketch of Pleasant Street Elementary fading into a modern elementary building.

November 3 Ballot Issue: 1% Earned Income Tax Levy for Mount Vernon City Schools

Mount Vernon City Schools has spent the past year and a half evaluating the future of our district — including both our facilities and day-to-day operations.

With input from community members, staff, and board representatives, we reviewed safety, enrollment, maintenance costs, state funding, property tax changes, and the evolving needs of our students.

Our financial situation has shifted since the May 2026 levy. Today, Mount Vernon is facing aging buildings and a shrinking operating budget at the same time.

Changes in state funding and property tax laws are projected to reduce expected district revenue by $11.5 million over the next four years — nearly $2.9 million, or 6% less each year.

The district continues to address significant facility needs and is pursuing state funding through the Ohio Facilities Construction Commission (OFCC) to help reduce the local cost of facility improvements.

Because of our shrinking financial resources, we have reduced the scope of the proposed facility project and are directing more resources toward ongoing operations.

The November Levy

This November, the community will consider a 1% earned income tax for 30 years designed to help address both:

  • Facility needs and the future of our school buildings
  • Operating needs resulting from the projected reduction in district revenue

Our goal is to provide our community with clear, transparent information about the district’s financial outlook, facility needs, and the proposed levy.

The Master Plan Includes:

  • Construction of three new elementary schools

  • Improvements to Mount Vernon High School

These investments are designed to enhance safety, modernize learning environments, improve functionality, and responsibly address aging infrastructure.

At its core, the master plan is built around five key priorities:

  • Improved School Safety

  • Improved Operational Efficiency

  • Better Meeting the Needs of Diverse Learners

  • Support for Modern Teaching Practices

  • Addressing Aging and Outdated Infrastructure

Honoring our Past -  Building our Future.

 

Circular image of a rendered elementary school Honoring Our Past Building Our Future

We honor the legacy of our schools and the generations they have served. At the same time, we recognize the need to provide modern, high-quality learning environments. By investing in the future, we ensure today’s students—and those to come—have the opportunities they deserve.

any text here

Build Three K–5 Elementary Schools

Why: Create operationally efficient, modern learning environments designed for today's instruction, services, and safety needs.
  • Modern classroom and collaborative learning spaces
  • Secure entrance and improved school safety
  • Fully handicap accessible buildings
  • Dedicated kitchens and cafeterias
  • Art and Music classrooms
  • Specialized classroom for special services, gifted, STEM.
  • Updated mechanical systems and infrastructure
  • Adequate parking, pickup, and drop-off locations
  • Playgrounds and green spaces.

Improve Mount Vernon High School

Why: Mount Vernon High School, built in 1968, is the heart of our community. This project addresses a much-needed auditorium and music room to ensure the facility continues to serve our students and community with pride.

  • New 800+ seat auditorium and music facility
  • Renovated cafeteria and kitchen
  • Renovated entrances and safety upgrades.

any text here

Age of Elementary Buildings

Our school buildings range from 68 to 122 years old. While they have served our community well for generations, they no longer meet the needs of today’s students or support the learning environments required for the future.

Renovate to Replace Ratio

Renovation costs exceeds 90% of the cost to build new, offering limited long-term value. By choosing new construction, we gain a modern facility at a similar cost—while also qualifying for nearly $26 million in state funding. Renovation would not only limit value but also make us ineligible for those state dollars.

Operational Efficiency

Transitioning from six elementary buildings to four allows us to operate more efficiently by reducing duplication of services, lowering maintenance and utility costs, and maximizing staff and resources—all while better supporting student learning.

any text here

November Ballot Issue – Frequently Asked Questions

The Levy

The November Ballot

STUDENT & COMMUNITY IMPACT

This plan is about more than buildings—it’s about ensuring every student in Mount Vernon has access to safe, modern, and efficient learning environments, while respecting the community’s history and being responsible with its future.

COMMON COMMUNITY QUESTIONS

Mount Vernon City Schools Honoring the Past Building the Future Logo with MV and flying bee.